A.J.’s Concrete Pumping provided 47 and 58 meter Z-booms for pouring bridge decks for the construction of the Golden Ears Bridge. These pours were especially challenging due to the high MPA concrete mix which needed to be pumped. All deck topping slabs were poured during the evenings.